Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | 6 Months |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Four-Stroke Air-Cooled Engine Petrol 154F Engine
1.Passed 500 hours endurance test.
2.CE,ROHS emission test qualified.
3.Easy to maintain and less malfunction.
4.Easy starting, smooth running with minimal vibration.
5.Thicker fuel tank, steel crankshaft/camshaft.
6.High quality carburetor,10,000 times recoil start test passed.
EAGLE SINO is the best choice for the industry because of its high efficiency, stable quality and low cost.
Product Name | 154F Small Petrol Engines |
Power Model | 154F/P |
Bore×stroke(mm) | 54×46 |
Displacement (ml) | 106 |
Maximum Power (kW/rpm) | 1.3/3600 |
Rated Power (kW/rpm) | 1.1/3600 |
Maximum Torque (N-m/rpm) | 3.2/3000 |
Fuel Tank Volume (L) | 1.4 |
Fuel Consumption Rate (g/kW-h) | 614 |
Oil Volume(L) | 0.36 |
Net Weight(kg) | 8 |
Packing Size(L×W×H)(mm) | 305×290×360 |
Condition | Brand new |
Q1. What products do you offer?
★ We can supply agricultural machinery, garden tools and related accessories.
★ Like power tiller, brush cutter, chainsaws, power, pumps and generators etc.
Q2. How about the quality of your product?
★ Our products manufactured strictly according to national and international standard.
★ We take a test on every product before delivery.
Q3. Can we customize our logo/company name on machine?
★ Yes, we offer OEM and ODM service.
Q4. Can I get a discount?
★ Yes, the more quantity, the better the price. Please contact us to get the best price.
Q5. How about delivery time of your machine?
★ Generally it needs 10-15 days for big machines or producing line,and it will be much longer but within our negotiated delivery time